InsidEnergy

Slider Image

Loom Solar secures second land allotment from Uttar Pradesh government to scale solar and BESS manufacturing capacity

By Enersider Desk | New Delhi 

Loom Solar Updated Logo 2019 – Loom Solar Store

Loom Solar has secured an additional land allotment from the Government of Uttar Pradesh. The company has been allotted a 33,400 sq. m. (approximately 8.25 acres) plot at Industrial Model Land Corporation (IMLC), Meerut. The allotment was formalised at Lok Bhawan, Lucknow, in the presence of Chief Minister Yogi Adityanath and Industrial Minister Nand Gopal ‘Nandi’ Gupta.

This new land parcel is independent of Loom Solar’s existing 7.5-acre facility in Kosi, Uttar Pradesh, where a 1.2 GW solar module manufacturing unit is currently under development.

The Meerut facility is dedicated to solar module manufacturing and will enable the company to establish a high-throughput production line. Both facilities will support Loom’s multi-GW manufacturing roadmap and help address India’s solar demand, aligned with the national target of achieving 500 GW of non-fossil fuel capacity by 2030.

Amod Anand, Co-Founder and Director, Loom Solar, said: “This land allotment by the Government of Uttar Pradesh strengthens our manufacturing backbone across both solar modules and BESS solutions. Alongside the 1.2 GW Kosi plant, it gives Loom Solar the infrastructure to meet India’s multi-GW demand trajectory with fully indigenous capacity.”

Loom’s expansion aligns with Aatmanirbhar Bharat, the Production-Linked Incentive (PLI) scheme, ALMM regulations, and Domestic Content Requirements (DCR). Beyond modules, Loom Solar is scaling its BESS portfolio for utility-scale and distributed applications.

The dual-plant strategy across Kosi and Meerut is expected to generate thousands of direct and indirect employment opportunities.

Also Read: L&T to supply 3 lakh tonne green ammonia to Japan’s ITOCHU from proposed Kandla facility

Other Articles You May Read

Solar and wind expansion may drive USD 10-15 bn land investments by 2030: Report

By ANI | New Delhi India’s push to expand solar and wind power capacity is likely to create USD 10-15…

India may need over 60 GW energy storage capacity by 2030 to support clean energy transition: Report

By ANI | New Delhi India will require more than 60 GW of energy storage capacity by 2030, with nearly…

REnergy Dynamics Secures Two CBG Projects in Tamil Nadu

By Enersider Desk | New Delhi REnergy Dynamics (RED) has secured two Waste-to-Compressed Biogas (CBG) projects from Refex Renewables in…

Indian Railways approves 54 km Kiul-Jhajha 3rd line project at ₹962 crore

By Enersider Desk | New Delhi Kiul-Jhajha 3rd Line Project to Strengthen Passenger Movement, Connectivity and Regional Industrial Growth: Ashwini…